A Blown Engine Sent the Navy's Second Stealth Destroyer Back to the Shipyard
The Zumwalt-class vessel is having turbine trouble.
By Andrew MosemanGetty Images
The U.S. Navy had its fair share of problems when developing the USS Zumwalt, the stealth destroyer that would be the namesake of a new class of vessels (including ammo that was too expensive to fire). Now the second Zumwalt-class ship, the USS Michael Monsoor, had to head back to its shipyard because of engine trouble.
The Michael Monsoor finished its acceptance trials back in February of 2018. But as Military.com now reports, the ship suffered damage to its turbine blades during those trials that will require two of its Rolls Royce-built MT30 marine gas turbine engines to be replaced.
The Navy took "partial delivery" of the stealth destroyer in April, but has known about the problem since February. Last week the vessel went back to its shipyard, the Bath Iron Works in Maine, for the necessary repairs. Rear Adm. William Galinis told USNI News:
"Regrettably, coming off her acceptance trials we found a problem with one of the main turbine engines that drives one of the main generators; we're having to change it out. So we're working very closely with Bath Iron Works, with Rolls-Royce to get that engine changed out before she leaves Bath later this fall and sails to San Diego to start her combat system activation availability next year."
As we reported back in February when the Monsoor passed its trials, though, the Navy has bigger concerns here besides just mechanical problems. The Zumwalt program, once envisioned as a group of 32, is now down to just three in reality, with their mission uncertain.
No comments:
Post a Comment